Randem

We also have ads on the KAIO radio group Q103 FM, 94.3 FM and 95.1 FM. The 30 second ads air 3 time daily on each station. This is the ad, of course audio only.


Randem

Installed curtain separators for the office. We will separate the classroom from the tech side when both are in use.


Randem

Ready for classes tomorrow (Sunday)!


Randem

The classroom is now setup and awaiting the mini computers. We are looking for instructors for the classes (of course students also :D )


Randem

Well, on October 10, 2023 we finally got our internet and phone service installed  :) . Now we are officially open for business 8) . We have all our new computers and workstations and can do everything that we could do before the Lahaina Wildfires. Come down and see us!


Randem

Well, we are still waiting for internet. I have been trying since Sept 3, 2023. Spectrum messed up again, Well maybe it was just a lazy technician... He came to our building and then texted me that he could not complete the job. He never came to my office to discuss it, then the lazy boy marked the order complete after he did nothing! I called the office and they were very much clueless also. They told me some outrageous lie about me having service. Mind you that there is no equipment present and not even a coax cable, Maybe they installed wireless internet and phone service :o . Not only does the left hand not know what they right hand is doing, the left hand does not even care...

Here is my flyer that I am sending out to get new customers
<a href="https://randemsystems.cloud/data/BusinessOpener1.pdf" target="_blank">https://randemsystems.cloud/data/BusinessOpener1.pdf</a>

Randem

We are getting the office ready for business. Spectrum's contractor is suppose to come on Monday, September 26, 2023 to install a conduit in the hallway for the new spectrum line for the office. They will come back on Tuesday to install the conduit in the office. I don't know if they are installing the conduit along with the new line or just the conduit and Spectrum will come install the line. Hopefully I will find out tomorrow.

Today I installed two new Smart TV's and two cameras of the Digital Video Recorder (DVR). We are ready for customers. We just have to help them find us  ;D


Randem


Randem

Filling up the office space... Adding something new-ish.


Randem

More additions to the office, just using the basics...


Randem

The new additions to the office... TV's, gaming consoles cases, things on shelves. Have to make it seem like we have been here forever... All we need now is Internet and customers, well we still need inventory also ;D


Randem

Well, Spectrum has gotten the ROE (Right of Entry) signed today for our building, so the work can begin. I still don't know when they will start or complete their work, but considering all the work they have to do on the Lahaina side of the island to get service back up; it may take a while. Spectrum is now working seven days a week though... two old customers who also lost everything came by with computers for me to help them with, it's a start; they still know where to go when they need help! Now to work on getting new customers too.

I will post updated pictures of the latest work done in the office tomorrow. Long days for me...

Randem

I put up two more sheets of plexiglass over two more windows, 3 more to go. Plexiglass is pretty expensive here so I can only do 1 to 2 at a time. We can't officially open until we get internet. Spectrum has to run a new conduit and lines so we can get high speed internet. The building is old and the current lines will not support what we need. We may not get internet until September 29, 2023 at the earliest. Until then we can do minor repairs that do not include the internet. I currently have to use my cell phone as a hotspot for internet for small jobs. Still need inventory and many other small things that make an office work.

Randem

Today's work was to put plexiglass in one of the windows to keep the hot air from coming in and keeping the cool air from going out. This is a very old building with louver windows that do not close well or even open for that matter. Five more windows to complete... The workstations have been setup and some office supplies and repair supplies have been put on the shelves. We also installed a compact fridge in today with the help of a friend to help transport and carry it up 21 stairs. The building has no elevator. :(